Over the 2017 summer, work has been done on the main trail area that follows the power line from the traffic circle on Mountain View to the trail entrance to the Pine Street trail access. I have not hiked the area very much because of all the large machinery, and work being done there, but I believe as of September 25th, the work appears to be completed.
I am posting a few pictures of the progress, including a photo that shows the beginning of the proposed paved trail from McIntyre Creek to Pine Street.
|
The water main at the Pine Street access trail
|
|
The cleared area, with some left over logs |
|
Fire hydrant & what appears to be an access point |
|
Piles of dirt brought in after pipe laid
|
|
The reseeded area |
|
The beginning of paved trail to Pine Street (left by road sign)
|